The work is finished, but the premises aren't ready to hand over yet. Fine dust covers everything, paint marks remain on the windows and the floor bears the traces of the site. Post-construction cleaning is the last step before handover. Here is what it should cover, room by room.
When to schedule it
Once every trade has left, and not before. If an electrician or painter comes back after the clean, the dust returns. Ideally, book the clean one or two days before handover or move-in, as soon as the date is known.
The checklist
Removal
- Packaging, boxes and pallets
- Sheeting, film and floor protection
- Small finishing waste (offcuts, caps, tape)
Dusting (top to bottom)
- Ceilings, cornices and light fittings
- Walls and partitions
- Radiators, sockets, switches, vents
- Skirting, door frames, sills
Always work from top to bottom: dust falling from the ceiling ends up on the floor, which you clean last.
Construction marks
- Paint splashes on floors, windows and joinery
- Glue, plaster and cement residue
- Labels and stickers on new appliances
Windows and joinery
- Protective film removed
- Windows inside and out
- Frames, sliding-door tracks and thresholds
Washrooms and kitchens
- Sanitary ware, taps, tiling
- Appliances and worktops
- Inside cupboards
Floors (last)
- Full vacuum, corners included
- Washing suited to each surface
Why a household vacuum isn't enough
Construction dust (plaster, cement) is extremely fine: it passes through standard filters, damages motors and settles again immediately. Professionals use industrial vacuums with suitable filtration and specific products that remove residue without damaging new finishes.
The final check
Before handing over the keys, go round room by room with the checklist. Look against the light at windows and glossy floors: that's where marks show. A good provider does this check with you and comes back for anything missed.